Final Phase II Remedial Investigation Work Plan

Joe Sorge is the environmental consultant retained by MQI to investigate the embankments constructed against the quarry faces in the northwest quadrant of the quarry, and to make recommendations.  He submitted several reports to NJ DEP in conjunction with this work.

Below is a link to one dated March 2011 that he also submitted to the Planning Board for hearings on the rehab plan in 2011, what I call Plan 2011.  Mr. Sorge testified at a hearing on December 20, 2011

Final Phase II RIWP

A map showing test well locations is on page 18.

A table showing results of analyses of well water concentrations is on page 28.

Bill Allen 05-03-17

This entry was posted in Rehab-Plan and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *