Potentially Harmful Substances in Fill

Below is a link to a letter to the Planning Board for its hearings on the rehab plan submitted in 2011, what I call Plan 11.  I wrote it on May 5, 2012 but did not get to present it and aural testimony until August 21.

Potentially Harmful Substances in Fill

Bill Allen    05-03-17

Posted in Rehab-Plan | Tagged , | Leave a comment

Final Phase II Remedial Investigation Work Plan

Joe Sorge is the environmental consultant retained by MQI to investigate the embankments constructed against the quarry faces in the northwest quadrant of the quarry, and to make recommendations.  He submitted several reports to NJ DEP in conjunction with this work.

Below is a link to one dated March 2011 that he also submitted to the Planning Board for hearings on the rehab plan in 2011, what I call Plan 2011.  Mr. Sorge testified at a hearing on December 20, 2011

Final Phase II RIWP

A map showing test well locations is on page 18.

A table showing results of analyses of well water concentrations is on page 28.

Bill Allen 05-03-17

Posted in Rehab-Plan | Tagged , | Leave a comment

Quarry Park and Lakeview Village

This is a concept plan for the quarry tract that was first designed in 2004.  It was revised in 2009 to reflect the imported fill in the northwest corner.  The plan drawing is below.  Click on the image to enlarge it to fill the screen.  Click again to enlarge it further.  Click on back arrow to return here.

AAA01_edited-10

The revised plan was handed out at Charter Day in 2009 on a single sheet.  The drawing above was on one side and a brief narrative description was on the other.  To read this brief description go to brief description.

I planned to submit the revised plan to the Planning Board during the board’s review of the Master Plan in 2009 with the drawing above and a detailed narrative description.  To read this go to detailed description.

Citing ongoing litigation between MQI/Tilcon and the township, the Planning Board attorney advised board members to not discuss or comment on the quarry land or my proposal for it.  They followed his advice.  I was not permitted to submit the concept plan and its description.

The topography on the quarry tract today differs somewhat from that used to design the plan in 2004 and revise it in 2009.  I believe the concept plan still illustrates what is possible.

The date of this post has been set to reflect the date of latest document cited.

Bill Allen,    06-21-14

Posted in Quarry Park | Tagged | Leave a comment

Millington Quarry in Photos from 2008

Below are four aerial photos of the quarry taken in June 2008.  Left click on a photo to enlarge it.  Click back arrow to return to this page.

QuarryAerial_20080612_000.QuarryAerial_20080612_042

Photo 1 (above left):  West side of quarry viewed from southwest.

Photo 2 (above right):  Center of quarry viewed from south.

QuarryAerial_20080612_045.QuarryAerial_20080612_044

Photo 3 (above left):  Center of quarry viewed from southeast.  Existing pond is a little left and down from center of photo.

Photo 4 (above right):  Close-up of Photo 3 that shows steep quarry faces rising from pond.  Pond is projected to fill and become a lake that rises a little more than half way up the faces shown in the photo.

The post date has been set to reflect the date of the photos.

Bill Allen,  07-10-14